Code 222743
PublishDate: Sunday, April 11, 202116:29

Solar Power Installation Work Began in Baghlan

Pul-e-Khomri (BNA) The installation work of solar electricity in Pul-e-Khumri city center of Baghlan began yesterday.

Afghan Voice Agency (AVA)_#Mir_Agha_Afzali, Baghlan head of Water Supply Dept. told BNA, this solar power plant which has the capacity to produce 12 kilowatts of electricity, has been installed at a cost of 13,000 US dollars with the financial cooperation of Agha Khan Foundation.

Afzali added that the purpose of creating this solar power plant is to supply the #electricity needed by the water supply network of the Nawabad area of North Baghlan coal mine.

Your comment

Related posts

Latest news